Diary of an Apprentice Boatbuilder

This blog will follow my progress from the kind of guy that struggles to put up shelves to launching my own boat in 38 weeks.

Monday, 7 November 2011

A Roving... A Roving... and yet more roving....

Today we has been mainly nailing and riveting, which involves roving.

A rove for the uninitiated (and hopefully not being patronising) is a conical disc of copper with a small hole in the centre.  When a nail is driven through the planking the rove is driven onto the inner end of the nail, the nail is snipped off almost flush with the top of the rove and is then peened over to form a rivet.

Today we riveted 312 nails, fortunately we only have about 300 left to do tomorrow and then we can get on with the next stage of construction which is putting in the floors. So after the photographs yesterday of the timbers in place here are a few of the timbers nailed and roved...


Riveted timbers at the stern...


A shot of the bow timbers and in the foreground you can see two of the seven floors that have been joggled and beveled to fit over the timbers and create a level platform for the sole boards.  There principal purpose however, is to join the two sides of the boat together and strengthen the centre line structure.


I have to say that while the finished product is very satisfying, spending the day kneeling inside a boat, even with knee pads, and hammering copper rivets is mind numbingly tedious, and painful but nonetheless essential when building a traditional clinker boat.

We are on course (no pun intended) to make the launch date of the 7th December but it will be a tight run schedule.

Sunday, 6 November 2011

Camera unavailable so narrative only today....

Sorry about this but have been having problems with camera, well not so much problems, more I forgot to bring back my disc reader and so can't transfer the pictures.  However, I have some on my 'phone. I will post them shortly:

Shortly:




The top two pictures show the timbers steamed in but not yet nailed and the bottom picture shows the mizzen mast under construction.

Once the planking is completed the hull is re-enforced by steaming in lateral oak sections of timber, which because they are steamed in are known as 'timbers', if they had been constructed from futtocks (several individual pieces) or cut from one solid piece of grown timber they would normally be called frames.

Steaming 62 pieces of oak and then bending them to shape without scalding yourself is an interesting process and you get about 30-45 seconds to get the wood out of the steamer and bent and clamped in place before it cools to much to bend.

The next task is to drill, nail and rivet the timbers through each plank, that is 34 timbers with 26 nails in each giving 884 nails; each one averages out at about 90 seconds = 79560 seconds =1326 minutes = 22 hours. We are about 16 hours into this particular nailathon... between the hammering and then the riveting it is pretty numbing and being hunched over in a boat riveting has certainly given my back a lot to think about.

There are occasional amusing interludes, part of the process involves forcing the timber down onto the plank sometimes by the application of a foot...  at times like this it is wise to ensure that the person under the boat, who cannot see you, is nailing into the hole you think they are nailing into.  Yes you guessed, and yes it hurt.

We have also started work on the floors, but more of that later (they are not what you stand on, those are called soleboards) and as you can see from the pictures we have also installed the centre plate box and now await delivery of the plate itself, the sails have been ordered from a company in Plymouth and there is a small shed load of other bits arriving from the chandlers in the next few days.  We also have the paint and once the floors, and deck are installed the next task will be to complete the painting of the interior before we finish of the exterior....

Saturday, 22 October 2011

An Apology...

Firstly can I apologise for the lack of posts over the past couple of weeks, a combination of factors has meant that I have been unable to access my blog.

However we have now finished planking, removed the moulds, and cut the sheer.  So on the basis that a picture says a thousand words...

Nailing on the Sheer Strake... the FINAL plank of the planking saga

Still nailing!

This is the point at which we had finished the planking, started to remove the moulds, but decided to go to the Pub to celebrate!

All the frames removed, amazing how quickly one can get moulds out when you've had a couple of pints.


Sheer Strake in place but without the final sheer (shape of the top of the plank) marked or cut

Cutting the Starboard sheer...



Cutting the Port sheer...


TARRRRAAA!!!

The Rose finally planked and ready for fitting out


So we have completed the planking, well behind schedule, but we can now push ahead with the fitting out that hopefully we will have more help with.  The next stage is to fit the Centre plate box, clean up the inside of the hull, fill and fair any knot holes and gaps and then apply a couple of coats of primer prior to putting in the timbers and floors.

The mast is virtually complete, the Gaff is complete and the mizzen mast is glued up ready for shaping, so while there is a lot to do all is now achievable.

The Sheer is the line of the top the plank which gives the boat its shape when it is in the water, it is considered one of the most important aspects of a boat and it took about an hour working with a baton to get the Jessica Rose's sheer the way we wanted it.  The old way of doing it was to run a string from the outboard edge of the transom at sheer level to the stem and then by eye mark the sheer in the same plane as the string! No I didn't get it either, so we used a very long sail baton clamped to the plank.

More to follow as we get into the interesting bit... thank you for your patience!

Wednesday, 5 October 2011

And so we progress...

I thought this was quite a fun 'phot and gives an impression of what she will look like head on.


There still needs to be a cutwater fashioned on the stem which will narrow the bow from 2 inches to about an inch, and of course she has to grow another 4 planks upwards to complete the hull.  We should get another pair of planks on tomorrow and then finish next week or by tuesday of the following week.

Then all we have to do is fit her out!!!

By December 7th...

Tuesday, 4 October 2011

Planking...

Well I did warn you; we are still fighting to get the planks on, although this week we do seem to have turned the corner and hopefully we will be onto more interesting stuff in a few days time when we start on 'inwales', eking pieces, breast hooks, hanging knees, and thwarts.  That is not to mention timbers floors, deck beams, and carlins... so I won't.

More 'phot's latr in the week..

Sunday, 2 October 2011

Britain at Risk...

Boat will be featured in a programme called Britain at Risk that will be shown in February 2012.  Great fun to see it recorded, I don't feature, I was to old!

Saturday, 1 October 2011

Spars... Introducing Rob!

It is important to mention that we have a new member of the 'Rose Team in the form of Rob who has kindly taken on the lion's share of the work manufacturing the Spars.  He is rapidly becoming the Course expert on the production of spars!

Tapering the stock


Producing a 17' mast that tapers from 3.5 inches to 2.5 inches requires extremely careful marking out and is a time consuming process, in addition Rob has also produced the Gaff and has promised to assist with the bowsprit, mizzen mast and sprit.

More photographs to follow...